Who provides mechanical engineering and load calculations?
Your project team establishes who prepares drawings and calculations. Our proposal and site plan identify installation work we perform and coordination points with your design professionals.
What project documents should we send with an inquiry?
Share drawing status, equipment selections if chosen, intended occupancy date, and general contractor contact so we can discuss rigging, access, and startup scope.
Who coordinates crane picks, roof access, and lane closures?
The proposal and site plan name who manages rigging, roof access, traffic control, and tenant notices. We align HVAC setting and startup with that plan.
When does startup happen on a new system?
After power, controls, duct, and piping connections are complete per project documents, we perform startup checks appropriate to the equipment we install within our agreed scope.
How is formal test-and-balance handled?
When your project requires certified test-and-balance or commissioning, that work is scoped with your project team separately from basic equipment startup we perform under our installation agreement.