Retail & Multi-SiteOrlando, FL

Phased Rooftop Replacement for an Orlando Retail Center

Replaced 12 aging rooftop units across an open retail center with zero tenant downtime by phasing work around store hours.

Rooftop UnitsCommercial HVAC ReplacementPreventive Maintenance
12
Units replaced
0
Hours of tenant downtime
28%
Energy use reduction
90%
Drop in service calls
The Challenge

Twelve 15-year-old rooftop units were failing one by one, generating constant tenant complaints and emergency calls.

The property manager needed the units replaced without disrupting business hours for any of the open stores.

Energy costs had climbed steadily as the aging equipment lost efficiency.

Our Solution

We surveyed every unit, documented condition, and built a phased replacement plan prioritizing the worst performers first.

Crews staged crane lifts and changeouts before opening hours and on low-traffic days to avoid impacting tenants.

We installed high-efficiency units properly sized for each tenant space and enrolled the property in a preventive maintenance plan.

Phased to protect tenant operations
High-efficiency, right-sized equipment
Enrolled in ongoing maintenance
Consolidated reporting for the property manager

They worked around our tenants instead of the other way around. We didn't get a single complaint during the whole project.

Regional Property Manager

Have a similar challenge?

Let's talk about your facility and how we can help.

(877) 258-3664