Designed and built a large-volume ventilation and cooling system for a new 120,000 sq ft distribution facility, delivered on schedule.
A new 120,000 sq ft distribution facility needed a mechanical system designed and built from scratch.
The owner wanted a single contractor accountable for design, equipment, installation, and commissioning.
The schedule was tight, tied to the facility's planned opening date.
Our design-build team engineered a large-volume ventilation and spot-cooling system sized for the operation and Florida heat.
We coordinated equipment, ductwork, and controls under one contract to keep the project on schedule.
We commissioned the system and trained facility staff on operation before opening day.